The construction of the new business park along the Brechtsebaan in Schoten is progressing steadily.
The finishing touches on two modern industrial buildings are in full swing, with CBS Beton as a key partner. At the rear of one of the buildings, an impressive staircase hall has been built, requiring no fewer than 335 steps. Between the two buildings, where goods are unloaded, four large flower beds have been created using our CLF10GS walls. Another gem that has been realized.